Customization: | Available |
---|---|
Steering: | Left |
Mgnt Certification: | ISO10012 |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
As mining equipment factory , we not only supply the new energy Electric machinery or vehicles , but also we give full solution to mining industry .
Battery Power | |
Battery Type: | LFP Type |
Rated Capacity | 173 AH |
Voltage | 347 V |
Rated Energy | 60.16 KWH |
Energy Ratio | >150 WH/KG |
SOC working range | 8%~10% |
Item | Parameters | Item | Parameters |
Body (length x width x height) (mm) | 5560×1840×1830 | Front suspension type | Spiral spring of double wishbone |
Wheelbase (mm) | 3405 | Rear suspension type | Plate spring |
Front/rear tread (mm) | 1548/1548 | Tire specification | 265/65R17 |
Ground clearance (mm) | 215 | Speed km/h | 80 (adjustable speed limit) |
Item |
Parameters |
Item |
Parameters |
Motor power |
110kw |
Charging time |
80% charge in 1 hour |
Peak motor torque |
800Nm |
Battery swapping structure |
5 minutes to swap the battery |
Max motor speed |
4000rpm |
Gradeability |
It can climb 30° slopes at full load |
Battery type |
Lithium ion battery |
Endurance mileage |
250km |
Battery level |
60kwh |
Driving mode |
Part-time 4WD (BorgWarner Transfer Case) |
Battery voltage |
347V |
Maximum speed |
80km/h (adjustable speed limit) |
Aided driving |
Collision warning (optional) |
Battery maintenance |
Reduce battery loss by battery swapping |
1: What kind terms of payment can be accepted?
A: For terms of payment, L/C, T/T could accepted
2: What certificates are available in Machinery?
A: For the certificate, we have CE, ISO, Gost, EPA(USA)CCC,
3: What about the lead time?
A: 30 days after receiving the deposit.
4: What about the warranty time?
A: 12 months after shipment or 2000 working hours, whichever occurs first.
5. What about the Minimum Order Quantity?
A: The MOQ is 1 pcs.
6. How long will it take for the electric charging ?
A: 2 hours
7. How long will it take for the electric charging ?
A: 2 hours
8. How long will it take for replacing the battery ?
A: 5~10 mins
For more detailed product information or for sound proposal for your mining ,please send email to me